What is the cause of the card machine phenomenon when the metal crusher is loaded with forklift truck?

點(diǎn)擊次數(shù):  更新時(shí)間:24/10/28 12:55:10 來(lái)源:m.497789com.com關(guān)閉
分    享:

  

In the crushing process of using the road crusher, if the machine is stuck because of the forklift loading, there are many possible reasons, the following are some main analysis and summary:



   - When the forklift truck will pour too much material into the metal crusher at one time, it may lead to too much material accumulation in the crushing chamber, beyond the processing capacity of the crusher, resulting in a stuck machine. In addition, if the material block is too large, it may not be able to pass through the crushing chamber smoothly, resulting in blockage.

- Forklift loading, if the material distribution is not uniform, too much material in some areas, may also cause the crusher local overload and card.

- If the hammer head, sieve plate and other parts inside the crusher are worn, loosened or damaged, it may also affect the crushing effect, resulting in the phenomenon of the stuck machine. For example, when the hammer head is seriously worn, its striking force will be weakened, and it is difficult to effectively break the material; The blockage of the sieve plate will affect the discharge of the material.

- If the operator does not follow the correct operation process when using the forklift, such as the material speed is too fast, the Angle is not correct, etc., it may also lead to the crusher stuck.

In order to solve the problem of metal crusher due to forklift loading and card machine, the following measures can be taken:

- Ensure that the amount of material poured into the forklift is moderate to avoid excessive loading. The amount of feed can be controlled by setting up a feed hopper or using a quantitative feed device.

- Before loading, the material is pre-treated, such as screening, crushing large materials, etc., to ensure that the material entering the crusher meets the requirements.

- Regularly check the internal parts of the metal crusher, such as the hammer head, screen plate, etc., timely replacement of severely worn parts to ensure the normal operation of the equipment.

- Professional training of operators to improve their operational skills and safety awareness to ensure that they can operate forklifts and metal crushers correctly and safely.

- Install monitoring devices on the crusher, such as current monitor, sound and light alarm, etc., to monitor the operating status of the equipment in real time. Once an abnormal situation is found, stop the machine immediately for inspection and processing.

- If conditions permit, you can consider changing the feeding method, such as using belt conveyor instead of forklift loading. In this way, the material can be supplied more evenly and continuously, reducing the risk of the card machine.

When the crusher is broken, the sticking machine due to the forklift loading may be the result of a variety of factors. In order to avoid this situation, it is necessary to prevent and solve it from many aspects. The best way is to call the road friend after-sales phone for professional guidance 0539-6999999.